CASE STUDY: Northwestern University Garrett Evangelical Geothermal Project
Location
2121 Sheridan Rd, Evanston, IL.
Scope of Work
- Install 770’ lineal feet of 6” Poly and 300’ lineal Feet of 4” Poly Header pipe.
- Install 3530’ lineal feet of 40mm Poly supply and return pipe from (36) well locations to manifold chamber.
- Install (2) underground manifold chambers.
- Install all fusions at well locations and manifold chambers.
- Install all fusions for header conduits at manifold chambers and building entrance.
- Install by-pass valves and isolation valves for continuation to internal system.
Unusual Challenges
Intren was required to mobilize within
24 hours to start project due to
asphalt/parking schedule turnover
date. Intren encountered numerous
scope changes as well as large
amounts of public interest and
traffic due to classes being in
session at time work was performed.
Existing gas service was within
scope of work and needed to be
moved prior to our install.
Creative Solutions
Intren used our gas resources to
have existing gas service disconnected
and re-installed as our client
could not perform as well as had
no resources at that time. Intren
using our internal resources ensured
that project was completed in time
and parking lot was finished and
ready for restoration within schedule.